JSEA Directory - By Type
Wheeled Crushing Plant | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
001 | Setting up Wheeled Mobile Crushing Plant | 20/1/21 | → Link | → Link | ||
002 | Packing up Wheeled Mobile Crushing Plant | 20/1/21 | → Link | |||
062 | Removing Hopper and Feeder From Wheeled Plant | → Link | ||||
068 | Installing Hopper and Feeder From Wheeled Plant | → Link |
Front End Loader | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
003 | Wheeled Plant - Front End Loader | → Link | → | ||
005 | Loading Trucks With Front End Loader | → Link | |||
076 | Post Blast Clean Up | → Link | |||
090 | Scalping | → Link | |||
096 | Stockpile Material From Crusher | → Link | |||
098 | Construct Bund Wall | → Link | |||
108 | Load Haul Truck with Loader | → Link | |||
123 | Front End Loader - Loading Bins | → Link] | |||
972H Isolation | → Link | ||||
972H Release of Hydraulic Pressure | → Link | ||||
980H Isolation | → Link | ||||
980H Release of Hydraulic Pressure | → Link | ||||
192 | Brake Test - Front End Loader | → Link | |||
196 | Loadrite Calibration | → Link |
Screens | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
007 | Replace Screen Mesh | → Link |
Metso LT300 Cone Crusher | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
008 | Cone Blockage Procedure | → Link | |||
018 | Starting Up Track Mounted Cone Crusher | → Link | |||
019 | Shutting Down Track Mounted Cone Crusher | → Link | |||
020 | Clearing Track Mounted Cone Crusher | → Link | |||
027 | Operating Track Mounted Cone Crusher | → Link | |||
051 | LT300HP Setting up Cone Crusher | → Link | |||
061 | Changing Screens on Cone Crusher | → Link | |||
173 | HP300 Changing Cone Liners | → Link | |||
173 | HP300 Changing Cone Liners | → Link |
Jaw Crusher | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
009 | Adjusting Jaw on Crushing Plant | → Link | |||
063 | Warburn - Unblock Jaw with Jackhammer | → Link | |||
079 | Jaw Blockage - Shutdown | 20/1/21 | → Link | ||
080 | Jaw Blockage - Live Bridge | 21/10/20 | → Link | → Link | |
081 | Blockage Under Jaw - WRQ | → Link | |||
082 | Adjusting Jaw - WRQ | → Link | |||
Kue Ken Jaw | → Link |
Excavator | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
010 | Using Excavator to Feed Crusher | → Link | → | |||
050 | Using Exacavator to Lift | → Link | ||||
077 | Building Pad for Excavator | → Link | ||||
078 | Load Haul Truck with Excavator | → Link | ||||
106 | Operating of Excavator with Hammer | 20/1/21 | → Link | → Link | ||
195 | EC480D Excavator Isolation | 20/1/21 | → Link | |||
Pulverising | → Link |
General | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
011 | Working at Heights | 20/1/21 | → Link | → | ||
013 | Confined Spaces | → Link | ||||
021 | Tyre Changing - Mobile Plant | → Link | ||||
030 | Safe Use EWP | → Link | ||||
031 | Electric Welding | → Link | ||||
034 | Using Electric Power Tools | 20/1/21 | → Link | → Link | ||
058 | Operating and Refueling Small Motors | 20/1/21 | → Link | |||
070 | Abrasive Blasting | → Link | ||||
071 | ARC Gouging | → Link | ||||
072 | Operating Bandsaw | → Link | ||||
073 | Operate Punch and Shear | → Link | ||||
074 | Plasma Cutting | → Link | ||||
075 | Spray Painting | → Link | ||||
086 | Unblock Chute in Tunnel | → Link | ||||
087 | Changing Drive Belts | 20/1/21 | → Link | |||
088 | Patching Belts | 20/1/21 | → Link | |||
089 | Roller Changeout | 20/1/21 | → Link | |||
097 | Working Alone | → Link | ||||
100 | General Maintenance of Crushers | → Link | ||||
109 | Maintenance of Mobile Plant | → Link | ||||
110 | Use of Service Pit | → Link | ||||
120 | Replacing Moil on Hammer | → Link | ||||
121 | Battery Inspections | 20/1/21 | → Link | |||
122 | Jump Start 12v Batteries | → Link | ||||
170 | Using Duro Fuel Tank | → Link | ||||
191 | Blowing out Air Filters | 20/1/21 | → Link] | |||
194 | Cleaning out Machine Cabins | 20/1/21 | → Link | |||
Operate Bench Grinder | → Link | |||||
Oxy Cutting | → Link | |||||
Sand Blasting | → Link |
Drill and Blast | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
016 | Magazine Access and Shotfiring | → Link | |||
130 | Blast Security | → Link | |||
131 | Blasting Operations | → Link | |||
132 | Changing Hydraulic Hoses | → Link | |||
133 | Daily Servicing of Drill Rig | → Link | |||
134 | Drilling Blast Holes | → Link | |||
135 | Fire on a Drill Rig | → Link | |||
136 | Loading and Unloading a Drill Rig | → Link | |||
137 | Refit Hydraulic Pump to Drill Rig | → Link | |||
138 | Replace Air Compressor on Drill Rig | → Link | |||
139 | Setting up Blast Monitors | → Link | |||
140 | Towing a Trailer | → Link | |||
141 | Working Near Bench Faces | → Link | |||
142 | Working on Rod Changer Assembly | → Link | |||
143 | Refueling Prill Mixer | → Link | |||
Blasting procedure | → Link | ||||
Drill and Blast - Discovery of Misfired Explosives | → Link | ||||
Drill and Blast - Disposal of Deteriorated Explosives | → Link | ||||
Drill and Blast - Firing Blast | → Link | ||||
Drill and Blast - Inspection and Detection of Deteriorated Explosives | → Link | ||||
Drill and Blast - Loading Blast Holes | → Link | ||||
Drill and Blast - Tie In | → Link |
MVP Cone Crusher | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
037 | Changing the Manganese on the MVP Cone Crusher | → Link | → |
QE440/QE441 Sandvik Screen | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
QE440 Isolation | → Link |
J50 McClosky Jaw Crusher | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
190 | J50 Set Up Crusher | → Link] | ||||
→ | ||||||
→ |
Wheeled Plant Jaw | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
009 | Adjusting Jaw on Crushing Plant | → Link | |||
079 | Jaw Blockage - Shutdown | → Link | |||
080 | Jaw Blockage - Live Bridge | → Link | → Link | ||
047 | Changing Swing Jaw on Wheeled Plant | 20/1/21 | → Link | ||
048 | Changing Fixed Jaw on Wheeled Plant | 20/1/21 | → Link |
Metso LT1213S Impact Crusher | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
052 | LT1213S Changing Screens on Metso Impactor | → Link | → | |||
053 | LT1213S Adjusting Closed Side Settings | → Link | ||||
055 | LT1213S Set up Crusher | → Link | ||||
056 | LT1213S Replace Wear Plates | → Link | ||||
057 | LT1213S Replace Blow Bars | → Link | ||||
102 | LT1213S Replace Drive Belt on Impactor | → Link | ||||
104 | LT1213S Replace Conveyor Belt on Impactor | → Link |
Powerscreen | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
054 | Changing Screens on Powerscreen | → Link | ||||
→ | ||||||
→ |
Dozer | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
103 | Operating Dozer | → Link |
Haul Truck | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
108 | Operation of Haul Truck | → Link | → |
Articulated Haul Truck | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
105 | Articulated Dump Truck – Operation/Stockpiling and Maintenance | 1/11/20 | → Link |
Concrete | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
112 | Loading Customer with Skid Steer | → Link | ||||
113 | Loading Reinforcing with Forklift | → Link | ||||
114 | Loading Reinforcing with Overhead Crane | → Link | ||||
115 | Operation of Bender | → Link | ||||
116 | Operation of Punch and Shear - Reinforcing | → Link | ||||
117 | Reinforcing Delivery via Hiab | → Link | ||||
118 | Unloading Reinforcing | → Link | ||||
180 | Concrete Pumping with Truck Mounted Placing Boom | → Link | ||||
181 | Delivering Concrete | → Link | ||||
182 | Front End Loader in Concrete Batching | → Link | ||||
183 | Acid Wash Concrete Truck | → Link | ||||
184 | Put Aditives into Concrete Agitator via Platform | → Link | ||||
Recycling of Waste - Milbrae Concrete | → Link |
QJ341 Sandvik Jaw Crusher | |||||
---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure |
119 | QJ341 Operating Sandvik Jaw | → Link | → | ||
155 | QJ341 Isolation | → Link | |||
156 | QJ341 Setting up on Site | → Link | |||
157 | QJ157 Packing up for Transport | → Link | |||
158 | QJ341 Replacing Crusher Box Liner Plates | → Link | |||
159 | QJ341 Removing Toggle Plate | → Link | |||
160 | QJ341 Removing Swing Jaw Plate | → Link | |||
161 | QJ341 Removing Fixed Jaw Plate | → Link | |||
162 | QJ341 Installing Swing Jaw Plate | → Link | |||
163 | QJ341 Installing Fixed Jaw Plate | → Link | |||
164 | QJ341 Adjusting Side Conveyor Belt | → Link | |||
165 | QJ341 Adjusting Main Conveyor Belt | → Link |
Scorpion Pugmill | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
149 | Operate Pugmill | → Link | → | |||
→ | ||||||
→ |