Site Management Plan – Goodens Pit

Print Friendly and PDF

Document No: MBG.090.4.2 | Release Date: November 2022 | Author: Taylor | Approved: Taylor


1. Health and Safety Policy


2. Arrangements for Managing Risk


3. Systems, Procedures and Plans for Managing Risk

 
Principle Mining Hazard Present on site? principal mining hazard management plan Additional documents
Ground or strata failure Yes plan
Inundation or inrush No
Mines shafts and winding systems No
Roads and other vehicle operating areas Yes Plan →[Traffic Management Plan]
Dust and other airborne contaminates Yes Plan
Fire and explosion Yes Plan
Gas outbursts No
Spontaneous Combustion No
Subsidence No
 
 
SWMS Name SWMS
UJ440i (Sandvik) Crushing Plant
UJ440 (Sandvik) Isolaition → [Link]
UJ440 (Sandvik) Setting up crushing plant → [Link]
UJ440 (Sandvik) Operating crushing plant → [Link]
UJ440 (Sandvik) Packing up crushing plant → [Link]
UJ440 (Sandvik) Replace crusher drive belts → [Link]
UJ440 (Sandvik) Replace liners → [Link]
LT300HP (Metso) Cone Crusher
LT300HP (Metso) Setting up cone crusher Link
LT300HP (Metso) Changing cone liners Link
Excavator
Using excavator to feed crusher Link
Building pad for excavator Link
Using excavator to lift loads Link
Loader
Front end loader operations - Mobile crushing Link
Loading trucks using front end loader Link
Light Vehicle
Visitor Light vehicle operation in a quarry Link
Road Trucks
Truck operations in a quarry Link
Duro tank fuel trailer
Operating Duro diesel tank Link
 
Type By Frequency
Fire Extinguishers Eacom 6 Months
Lifting Equipment All Ways Rigging 6 Months
Quarry Open Pit Weekly Safety Inspection Quarry Manager Weekly
Plant Pre Start Inspections Operators Daily


5. Coordination of PCBU’s



7. Information Training & Instruction






12. Review of Control Measures



14. Measuring and Managing Performance of the SMS