Site Management Plan – Mobile Concrete
Document No: MBG.090.1.6 | Release Date: January 2016 | Author: xxxx | Approved: xxxx
Campaign Overview
The mobile concrete plant is currently located on site at the Whitton Cotton Gin.
Plant & Equipment
The following equipment will be used on site:
Equipment | Plant No. | Min. Safety Standard |
---|---|---|
CAT Loader |
JSEA Related to Operations & Equipment
Concrete | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
180 | Concrete Pumping with Truck Mounted Placing Boom | → Link | ||||
181 | Delivering Concrete | → Link | ||||
182 | Front End Loader in Concrete Batching | → Link | ||||
183 | Acid Wash Concrete Truck | → Link | ||||
184 | Put Aditives into Concrete Agitator via Platform | → Link | ||||
Recycling of Waste - Milbrae Concrete | → Link |
General | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | JSEA(Editable) | JSEA(PDF) | Procedure | |
011 | Working at Heights | 20/1/21 | → Link | → | ||
013 | Confined Spaces | → Link | ||||
021 | Tyre Changing - Mobile Plant | → Link | ||||
030 | Safe Use EWP | → Link | ||||
031 | Electric Welding | → Link | ||||
034 | Using Electric Power Tools | 20/1/21 | → Link | → Link | ||
058 | Operating and Refueling Small Motors | 20/1/21 | → Link | |||
075 | Spray Painting | → Link | ||||
087 | Changing Drive Belts | 20/1/21 | → Link | |||
088 | Patching Belts | 20/1/21 | → Link | |||
089 | Roller Changeout | 20/1/21 | → Link | |||
097 | Working Alone | → Link | ||||
109 | Maintenance of Mobile Plant | → Link | ||||
121 | Battery Inspections | 20/1/21 | → Link | |||
122 | Jump Start 12v Batteries | → Link | ||||
191 | Blowing out Air Filters | 20/1/21 | → Link] | |||
194 | Cleaning out Machine Cabins | 20/1/21 | → Link | |||
Operate Bench Grinder | → Link |
Safety Data Sheets (SDS)
Title | Title |
---|---|
→ Rheoplus 75 | → Cement Powder |
→ Pre-Mixed Concrete | → Diesel Fuel |
→ Hyspin AWH68 | → RX Super |
→ Hydraulic Oil | → LPG Gas |
→ Blu Muder Truck Wash | → Line Marking Paint |
→ AdBlue |
Location – Map
The site is located near Whitton, on the Whitton-Darlington Point Rd. Map
Emergency Response Plan
A copy of the Emergency Response Plan will be displayed prominently on site. Emergency Response Plan.
Traffic Management Plan
The Traffic Management Plan will be overlayed onto the site map and displayed prominently on site. Traffic Management Plan template.
Site Checklists
The following documents are to be used during site establishment and production:
Plant Hazard and Risk Assessment
Toolbox Talk Form
Inspections
Type | By | Frequency | Last Report | Next Report |
---|---|---|---|---|
Fire Extinguishers | Eacom | 6 Months | ||
Lifting Equipment | All Ways Rigging | 6 Months | ||
→ WHSE Inspection | WHSE Manager | 6 Months | ||
→ Housekeeping Inspection | Operations Manager | Weekly | ||
Plant Pre Start Inspections | Operators | Daily | NA | NA |
Plant Structural Audit | Engineer | x Years |
Safety Documentation
The following documents will be kept on site:
Toolbox Book
Incident Reporting forms
Take 5 books
Contractor/Visitor register
Site Induction
All personnel on site have completed the Milbrae Site Induction.
All contractors and visitors will report to the Site Supervisor for induction prior to entry.
WHSE Management System
The Site Management Plan and the WHSE Management System complete the safety documentation for all sites. Access the WHSE Management System here.